Third Floor Renovation Recap

Renovation of the third (3rd) floor of the law library began in May 2016 when we moved all the books down to the second (2nd) floor (see “Moving Books Completed!” post for more about that part of the process).  By mid-July, the shelves were taken down and new, comfy furniture and collaborative study spaces were installed (see “New Study Spaces: Reserve Through Room Calendar” post for more information on the collaborative study spaces).  Finally, in November 2016 the Relaxation Station migrated to the 3rd floor and was expanded (see “Unwind at the Relaxation Station” post for activity features).  The slideshow below reviews in pictures the full 7-month long process.  We appreciate everyone’s patience and feedback during the renovation.  Feel free to keep the conversation going by commenting on this post, and share how you like to use the new 3rd floor for study and relaxation!

This slideshow requires JavaScript.

 

Advertisements

About Laura M. Summers

Come visit me at Circulation! As a current library science student, I am interested in the interplay of libraries, the government, and the law. I have an avid interest in correctional facility libraries, and hope to be a part of bettering our approach to patrons behind bars.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Information

This entry was posted on December 19, 2016 by in Announcements and tagged , , .

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 18 other followers

Follow on WordPress.com
%d bloggers like this: